Among the different available reports you can find :
Ishikawa (fishbone scale)
Pareto
Histograms
Statistical Reports
In the statistical reports are found the principal data relative to the equipment performance, or to the maintenance actions undertaken :
- The number of events recorded during the analysis period.
- The monthly frequency of these events.
- The confidence intervals.
- The error factor.
- The average time between two events.
- The total duration time of the interventions.
- The average duration time of the interventions.
- The average number of days worked.
- The total work cost.
- The average work cost.
- The distribution of the intervention types undertaken.
- The average priority level attributed by the planners.
- The average number of waiting days prior to work starting.
And much more…
Back PBM Inc Génie-Conseil
|